{"id":11604,"date":"2021-12-31T18:07:47","date_gmt":"2021-12-31T23:07:47","guid":{"rendered":"https:\/\/ingles.profonanpe.org.pe\/?p=11604"},"modified":"2021-12-31T18:07:47","modified_gmt":"2021-12-31T23:07:47","slug":"ministry-of-energy-and-mines-approves-second-rehabilitation-plan-under-the-contingency-fund-for-environmental-remediation","status":"publish","type":"post","link":"https:\/\/ingles.profonanpe.org.pe\/?p=11604","title":{"rendered":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">On June 18, the Ministry of Energy and Mines (MINEM) approved through Directorial Resolution No. 149 -2021-MINEM\/DGAAH the \u201cRehabilitation Plan for Impacted Site S0109\u201d as it complies with the technical and legal requirements of environmental regulations. Impacted Site S0109 has an area of 336.58 m<\/span><span style=\"font-weight: 400;\">2<\/span><span style=\"font-weight: 400;\">; it is located adjacent to the territory of the Jos\u00e9 Olaya Native Community \u2013Corrientes River basin\u2013, district of Trompeteros, province and department of Loreto, and the volume of soil to be remediated is 302.92 m<\/span><span style=\"font-weight: 400;\">3<\/span><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">At the Impacted Site S0109 there is surface evidence of hydrocarbons, the outcrop of a spill in a nearby creek and evidence of spills in soils due to ruptured pipelines. The approval of the S0109 Remediation Plan is important because the affected site is located near a natural canal system, so remediation would avoid the possible impact on water sources, and would also improve the quality of ecosystems and the health of the communities living in the surrounding area.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">The remediation technique to be used will be a combination of isolation with geomembrane (removal of the affected material and disposal in a geomembrane cell) and the Stabilization\/Solidification technique (removal of the affected material and disposal in an impermeable cell with the addition of cement). In both cases, slopes will be shaped and the area will be revegetated.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">So far, the Rehabilitation Plans for sites S0115 and S0109 have been approved. S0115 was the first plan to be approved in February of this year and is located in the territory of the Nueva Jerusal\u00e9n Native Community in the Corrientes basin.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">With the approval of the S0109 Rehabilitation Plan, another step forward in the environmental remediation of sites impacted by hydrocarbon activities is being taken. This is the result of a joint effort between State entities and Federations of Native Communities, who make up the Contingency Fund Administration Board.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">In 2015 the Peruvian State approved the creation of the Contingency Fund for Environmental Remediation in order to allocate economic resources to prepare studies and the rehabilitation of areas impacted by hydrocarbons in the basins of the Mara\u00f1\u00f3n, Corrientes, Tigre and Pastaza rivers. Currently, the Fund has more than 400 million soles and, through its Board of Directors, has submitted 30 Rehabilitation Plans to MINEM for evaluation, of which 2 plans have been approved and 28 are under evaluation.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Profonanpe has the role of Technical, Administrative and Financial Secretariat of the Contingency Fund since January 2020.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On June 18, the Ministry of Energy and Mines (MINEM) approved through Directorial Resolution No. 149 -2021-MINEM\/DGAAH the \u201cRehabilitation Plan for Impacted Site S0109\u201d as it complies with the technical and legal requirements of environmental regulations. Impacted Site S0109 has an area of 336.58 m2; it is located adjacent to the territory of the Jos\u00e9 [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":11605,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-11604","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v18.0 (Yoast SEO v24.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation - Profonanpe<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation\" \/>\n<meta property=\"og:description\" content=\"On June 18, the Ministry of Energy and Mines (MINEM) approved through Directorial Resolution No. 149 -2021-MINEM\/DGAAH the \u201cRehabilitation Plan for Impacted Site S0109\u201d as it complies with the technical and legal requirements of environmental regulations. Impacted Site S0109 has an area of 336.58 m2; it is located adjacent to the territory of the Jos\u00e9 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\" \/>\n<meta property=\"og:site_name\" content=\"Profonanpe\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-31T23:07:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"717\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Comunicaciones Profonanpe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Comunicaciones Profonanpe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#article\",\"isPartOf\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\"},\"author\":{\"name\":\"Comunicaciones Profonanpe\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/6ee086a40bf0508f35dc607fd7947dd8\"},\"headline\":\"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation\",\"datePublished\":\"2021-12-31T23:07:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\"},\"wordCount\":421,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#organization\"},\"image\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg\",\"articleSection\":[\"Noticias\"],\"inLanguage\":\"es-PE\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\",\"name\":\"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation - Profonanpe\",\"isPartOf\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg\",\"datePublished\":\"2021-12-31T23:07:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#breadcrumb\"},\"inLanguage\":\"es-PE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ingles.profonanpe.org.pe\/?p=11604\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-PE\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg\",\"contentUrl\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg\",\"width\":800,\"height\":717},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/?p=11604#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/ingles.profonanpe.org.pe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#website\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/\",\"name\":\"Profonanpe\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ingles.profonanpe.org.pe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-PE\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#organization\",\"name\":\"Profonanpe\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-PE\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2020\/10\/Snippet-Profonanpe-v2.jpg\",\"contentUrl\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2020\/10\/Snippet-Profonanpe-v2.jpg\",\"width\":524,\"height\":274,\"caption\":\"Profonanpe\"},\"image\":{\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/6ee086a40bf0508f35dc607fd7947dd8\",\"name\":\"Comunicaciones Profonanpe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-PE\",\"@id\":\"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/themes\/manya\/Isotipo.jpg\",\"contentUrl\":\"https:\/\/ingles.profonanpe.org.pe\/wp-content\/themes\/manya\/Isotipo.jpg\",\"caption\":\"Comunicaciones Profonanpe\"},\"url\":\"https:\/\/ingles.profonanpe.org.pe\/?author=16\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation - Profonanpe","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ingles.profonanpe.org.pe\/?p=11604","og_locale":"es_ES","og_type":"article","og_title":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation","og_description":"On June 18, the Ministry of Energy and Mines (MINEM) approved through Directorial Resolution No. 149 -2021-MINEM\/DGAAH the \u201cRehabilitation Plan for Impacted Site S0109\u201d as it complies with the technical and legal requirements of environmental regulations. Impacted Site S0109 has an area of 336.58 m2; it is located adjacent to the territory of the Jos\u00e9 [&hellip;]","og_url":"https:\/\/ingles.profonanpe.org.pe\/?p=11604","og_site_name":"Profonanpe","article_published_time":"2021-12-31T23:07:47+00:00","og_image":[{"width":800,"height":717,"url":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","type":"image\/jpeg"}],"author":"Comunicaciones Profonanpe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Comunicaciones Profonanpe","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#article","isPartOf":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604"},"author":{"name":"Comunicaciones Profonanpe","@id":"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/6ee086a40bf0508f35dc607fd7947dd8"},"headline":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation","datePublished":"2021-12-31T23:07:47+00:00","mainEntityOfPage":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604"},"wordCount":421,"commentCount":0,"publisher":{"@id":"https:\/\/ingles.profonanpe.org.pe\/#organization"},"image":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage"},"thumbnailUrl":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","articleSection":["Noticias"],"inLanguage":"es-PE","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ingles.profonanpe.org.pe\/?p=11604#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604","url":"https:\/\/ingles.profonanpe.org.pe\/?p=11604","name":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation - Profonanpe","isPartOf":{"@id":"https:\/\/ingles.profonanpe.org.pe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage"},"image":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage"},"thumbnailUrl":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","datePublished":"2021-12-31T23:07:47+00:00","breadcrumb":{"@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#breadcrumb"},"inLanguage":"es-PE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ingles.profonanpe.org.pe\/?p=11604"]}]},{"@type":"ImageObject","inLanguage":"es-PE","@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#primaryimage","url":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","contentUrl":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","width":800,"height":717},{"@type":"BreadcrumbList","@id":"https:\/\/ingles.profonanpe.org.pe\/?p=11604#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ingles.profonanpe.org.pe\/"},{"@type":"ListItem","position":2,"name":"Ministry of Energy and Mines approves second Rehabilitation Plan under the Contingency Fund for Environmental Remediation"}]},{"@type":"WebSite","@id":"https:\/\/ingles.profonanpe.org.pe\/#website","url":"https:\/\/ingles.profonanpe.org.pe\/","name":"Profonanpe","description":"","publisher":{"@id":"https:\/\/ingles.profonanpe.org.pe\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ingles.profonanpe.org.pe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-PE"},{"@type":"Organization","@id":"https:\/\/ingles.profonanpe.org.pe\/#organization","name":"Profonanpe","url":"https:\/\/ingles.profonanpe.org.pe\/","logo":{"@type":"ImageObject","inLanguage":"es-PE","@id":"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/logo\/image\/","url":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2020\/10\/Snippet-Profonanpe-v2.jpg","contentUrl":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2020\/10\/Snippet-Profonanpe-v2.jpg","width":524,"height":274,"caption":"Profonanpe"},"image":{"@id":"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/6ee086a40bf0508f35dc607fd7947dd8","name":"Comunicaciones Profonanpe","image":{"@type":"ImageObject","inLanguage":"es-PE","@id":"https:\/\/ingles.profonanpe.org.pe\/#\/schema\/person\/image\/","url":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/themes\/manya\/Isotipo.jpg","contentUrl":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/themes\/manya\/Isotipo.jpg","caption":"Comunicaciones Profonanpe"},"url":"https:\/\/ingles.profonanpe.org.pe\/?author=16"}]}},"jetpack_featured_media_url":"https:\/\/ingles.profonanpe.org.pe\/wp-content\/uploads\/2021\/12\/TimePhoto_20180916_12484622-1536x1376-1.jpg","_links":{"self":[{"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/posts\/11604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11604"}],"version-history":[{"count":1,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/posts\/11604\/revisions"}],"predecessor-version":[{"id":11606,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/posts\/11604\/revisions\/11606"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=\/wp\/v2\/media\/11605"}],"wp:attachment":[{"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingles.profonanpe.org.pe\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}